News
Harlequin Liberty Switch – Vienna State Opera Installation
Find out more about our installation of Harlequin Liberty Switch at the Vienna Opera House
14th July 2022

Before the installation of the Harlequin Liberty Switch system could begin, a sub-floor was constructed using timber battens to provide a completely level surface onto which the pre-manufactured Liberty Switch base panels, complete with the drives and control mechanism, were installed.
The Harlequin Liberty top panels were then laid and locked into place, finally being topped with a Harlequin Studio performance vinyl floor.

The whole system is operated via a master control unit using a simple touch screen placed on the wall of the room which enables rapid transformation.
Contact us
Take the first step
Contact one of our experienced team and we’ll find the best solution for you. Connect with us by phone or email or for an instant response please click on our live chat.
Tel: +44 (0)1892 514 888
Email: enquiries@harlequinfloors.com